# KPIs - Target Values Defined by Resource

**URL:** <https://community.criticalmanufacturing.com/t/kpis-target-values-defined-by-resource/921>\
**Category:** Data & Analytics\
**Tags:** dashboard, electronics, v11.3\
**Created:** [October 9, 2026, 9:40am UTC](https://community.criticalmanufacturing.com/t/kpis-target-values-defined-by-resource/921 "2026-10-09T09:40:36Z")\
**Posts on this page:** 5\
**Page:** 1

<div class="post-metadata">

**Author:** ![Nuno\_Pacheco](https://avatars.discourse-cdn.com/v4/letter/n/9f8e36/32.png) [@Nuno\_Pacheco](https://community.criticalmanufacturing.com/u/Nuno_Pacheco)\
**Post date:** [October 9, 2026, 9:40am UTC](https://community.criticalmanufacturing.com/t/kpis-target-values-defined-by-resource/921/1 "2026-10-09T09:40:36Z")

</div>

Hello,

Our MEs KPIs have a configuration for specifying the target values.  
However, we have a customer that requires values according to each resource.  
i.e., different resources may have different target values.

 ![image](https://canada1.discourse-cdn.com/flex050/uploads/community_criticalmanufacturing/original/2X/6/6de67be43111c0b0e270b8865190340ea0ac4c16.png)

An ideia could be to have a generic table to hold these target values per resource and override them by catching an event, but i’m not finding anything suitable…

Any thoughts on this?

---

<div class="post-metadata">

**Author:** ![Paulo\_Soares](https://yyz2.discourse-cdn.com/flex050/user_avatar/community.criticalmanufacturing.com/paulo_soares/32/1270_2.png) [@Paulo\_Soares](https://community.criticalmanufacturing.com/u/Paulo_Soares)\
**Post date:** [October 9, 2026, 9:50am UTC](https://community.criticalmanufacturing.com/t/kpis-target-values-defined-by-resource/921/2 "2026-10-09T09:50:34Z")

</div>

Hello Nuno,

Thank you for your contribution.

## **There’s already a native mechanism for this: KPI Time Frames**

You don’t need a custom table — the KPI model natively supports per-entity target overrides through **Time Frames** , tied to Dimensions.

### **How it works**

1. **KPI Dimensions** define _how_ a KPI value is calculated for an entity (value type, source — Business Rule, ODS, DWH, or Cubes).
2. **KPI Time Frames** let you override the _target thresholds_ for a **specific entity instance** (e.g., a specific resource/step), within a given date range. Each time frame lets you specify:
  - **Entity’s name** — i.e., the specific entity instance (your resource) the override applies to
  - Whether it’s the **default** time frame or not
  - **From date / To date** — the validity window for that target

So, for example, you can define a time frame scoped to “Mixing” (or your resource) for “Current Day” with its own target values, and a different time frame for another resource/entity, each potentially with different date ranges (e.g., to handle seasonal production peaks).

![manage_timeframes](https://help.criticalmanufacturing.com/12.0/userguide/business-data/kpi/images/manage_timeframes.png)

### **How targets are resolved at runtime**

For **Dynamic KPIs** , the system resolves target-related fields in this order — runtime execution first, then falling back progressively:

| **Field** | **Resolution order** |
| --- | --- |
| **`TargetValue`** | runtime execution → **`KPI.DefaultTargetValue`** |
| **`CloseToTargetMinimumValue`** | runtime execution → **`KPITimeFrame.CloseToTargetMinimumValue`** → **`KPI.DefaultCloseToTargetMinimumValue`** |
| **`CloseToTargetMaximumValue`** | runtime execution → **`KPITimeFrame.CloseToTargetMaximumValue`** → **`KPI.DefaultCloseToTargetMaximumValue`** |
| **`InTargetMinimumValue`** | runtime execution → **`KPITimeFrame.InTargetMinimumValue`** → **`KPI.DefaultInTargetMinimumValue`** |
| **`InTargetMaximumValue`** | runtime execution → **`KPITimeFrame.InTargetMaximumValue`** → **`KPI.DefaultInTargetMaximumValue`** |

This means the **KPITimeFrame** entity is exactly the “per-entity override table” you were thinking of building yourself — it’s already part of the data model, tied to the entity instance (your Resource), with fallback to KPI-level defaults when no specific time frame applies.

### **Practical steps**

- Go to the KPI’s **Manage Dimensions and Time Frames** screen.
- Add a Dimension matching your calculation source.
- Add Time Frames, setting the **Entity’s name** to each Resource that needs a distinct target, with its own thresholds.
- Resources without an explicit time frame will simply fall back to the KPI’s default target values — no event-catching or custom override logic required.

This should cover your “different resources, different targets” requirement natively, without a custom table or event-based override.

* * *

**Sources:**

- [KPI Timeframes Tutorial - Developer Portal (12.0)](https://developer.criticalmanufacturing.com/12.0/explore/guides/customizations/analytics/bicardstutorial/bicards_tutorial/#kpi-timeframes)
- [Manage Dimensions and Time Frames - Documentation Portal (12.0)](https://help.criticalmanufacturing.com/12.0/userguide/business-data/kpi/manage_dimensions_timeframes/#step-2-manage-time-frames)
- [Dynamic KPIs Technical Reference - Developer Portal (12.0)](https://developer.criticalmanufacturing.com/12.0/explore/guides/customizations/analytics/bicardstutorial/technical_reference/#dynamic-kpis)
- [Create KPI Preconditions - Documentation Portal (12.0)](https://help.criticalmanufacturing.com/12.0/userguide/business-data/kpi/create_kpi/#preconditions)

---

<div class="post-metadata">

**Author:** ![Tom\_Bednarz](https://avatars.discourse-cdn.com/v4/letter/t/22d042/32.png) [@Tom\_Bednarz](https://community.criticalmanufacturing.com/u/Tom_Bednarz)\
**Post date:** [October 9, 2026, 10:58am UTC](https://community.criticalmanufacturing.com/t/kpis-target-values-defined-by-resource/921/3 "2026-10-09T10:58:53Z")

</div>

Hello,

Would limit sets be an option for this? Not sure how tightly they are linked to parameters. But some level of customization would be needed either way I guess.

Best Regards, Tom

---

<div class="post-metadata">

**Author:** ![Paulo\_Soares](https://yyz2.discourse-cdn.com/flex050/user_avatar/community.criticalmanufacturing.com/paulo_soares/32/1270_2.png) [@Paulo\_Soares](https://community.criticalmanufacturing.com/u/Paulo_Soares)\
**Post date:** [October 9, 2026, 11:04am UTC](https://community.criticalmanufacturing.com/t/kpis-target-values-defined-by-resource/921/4 "2026-10-09T11:04:19Z")

</div>

Hello Tom, since each KPI can be customized with any target values and associated with any resource, we believe the solution already provides the necessary flexibility and dynamic behavior required.

---

<div class="post-metadata">

**Author:** ![system](https://yyz2.discourse-cdn.com/flex050/user_avatar/community.criticalmanufacturing.com/system/32/23_2.png) [@system](https://community.criticalmanufacturing.com/u/system)\
**Post date:** [October 11, 2026, 11:04am UTC](https://community.criticalmanufacturing.com/t/kpis-target-values-defined-by-resource/921/5 "2026-10-11T11:04:42Z")

</div>

Closed on October 11, 2026, 11:04am UTC

This topic was automatically closed 2 days after the last reply. New replies are no longer allowed.
