# Line Verification in MES 11.2

**URL:** <https://community.criticalmanufacturing.com/t/line-verification-in-mes-11-2/735>\
**Category:** Blog\
**Created:** [November 11, 2025, 12:00am UTC](https://community.criticalmanufacturing.com/t/line-verification-in-mes-11-2/735 "2025-11-11T00:00:00Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Sofia\_Rodrigues](https://yyz2.discourse-cdn.com/flex050/user_avatar/community.criticalmanufacturing.com/sofia_rodrigues/32/1291_2.png) [@Sofia\_Rodrigues](https://community.criticalmanufacturing.com/u/Sofia_Rodrigues)\
**Post date:** [November 11, 2025, 12:00am UTC](https://community.criticalmanufacturing.com/t/line-verification-in-mes-11-2/735/1 "2025-11-11T00:00:00Z")

</div>

In manufacturing, quality doesn’t just happen at the beginning or end of a process — it must be maintained throughout. That’s where **Line Verification** comes in.

With version 11.2, Critical Manufacturing MES introduces a new way to ensure that materials in production are verified at the right moments, especially during sensitive transitions like shift changes or mid-shift breaks. This feature brings in-process control into sharper focus, helping teams maintain consistency, traceability, and compliance—without disrupting the flow.

## What Is Line Verification?

Line Verification is an event-driven feature that enables **in-process checks** while a material is being processed. It’s particularly useful in high-sensitivity environments where conditions like temperature, humidity, or operator handovers can impact product quality.

Once a material is tracked in, MES dynamically assigns a **Maintenance Plan Instance** that stays active until the material is tracked out. During this window, verification activities can be triggered based on time or shift events.

## Configuration Highlights

Let’s walk through the key elements that bring this feature to life.

🏭 **Calendar and Shift Definition**

To support time-based triggers, a calendar must be configured with a **Shift Definition** that reflects your operational schedule. For example, a 24-hour operation might use six 4-hour shifts.

This setup allows MES to calculate when shift breaks or changes occur, which is critical for triggering verifications at the right time.

⚙️ **Step Configuration**

To enable Line Verification at a specific step, set the `Enable In-Process Verification` property to True. This tells MES to monitor materials at that step and apply the appropriate verification logic.

📝 **Checklist and Data Collection**

Verification activities are defined using, for example checklists or data collection, and can be assigned for different events.

📋 **Maintenance Plan**

The core of Line Verification is a **Maintenance Plan** of scope In-Process Verification. It defines:

- **Trigger** : When the activity should occur (e.g., on shift change).
- **Duration** : How long the activity takes.
- **Due Window** : How soon it must be completed.
- **Tolerance** : Flexibility around the due time.

![Line Verification Maintenance Plan](https://canada1.discourse-cdn.com/flex050/uploads/community_criticalmanufacturing/original/1X/0cae8a33814d190f3e4dd229ada4f5549f82ac08.png "Line Verification Maintenance Plan")
_Line Verification Maintenance Plan_

These plans are linked to steps using the `Material In Process Verification Context` Smart Table, which resolves the correct plan based on context.

If a material is still in-process when a verification is due, MES will block track-out until the activity is completed—ensuring nothing slips through the cracks.

## Benefits

Line Verification in 11.2 brings meaningful improvements to how in-process quality is managed:

- **Proactive Control** : Verifications are triggered by real-world events, not just process steps.
- **Improved Traceability** : All actions are logged and linked to the material.
- **Operational Clarity** : Operators know exactly what to do and when.
- **Compliance Support** : Helps meet regulatory and quality standards.

## Final Thoughts

Line Verification reflects our ongoing effort to bring MES logic closer to the realities of the shop floor. It’s not just about tracking what happens — it’s about ensuring the right things happen, at the right time, with the right accountability.

For configuration steps and examples, check out the [Line Verification Tutorial](https://help.criticalmanufacturing.com/tutorials/modules/resource-tracking/lineverification/).

* * *

## Author

### Hi! My name is Sofia Rodrigues. ☺️

I joined the Critical Manufacturing family back in the striking year of 2020 as an MES Consultant/Functional Analyst. In 2023, I transitioned to the Product Documentation team, where I now focus on designing and creating content.

You can check me on [LinkedIn](https://www.linkedin.com/in/1-sofiarodrigues/)

Skills: Functional Analysis | System Testing | User Training | Technical Writer

![Sofia Rodrigues](https://canada1.discourse-cdn.com/flex050/uploads/community_criticalmanufacturing/original/1X/96c0f2b1daa8a15f0e860e08b3ffa9b2be9cd924.jpeg "MES Consultant")
_MES Consultant_

* * *
This is a companion discussion topic for the original entry at [https://devblog.criticalmanufacturing.com/blog/20251111\_line\_verification/](https://devblog.criticalmanufacturing.com/blog/20251111_line_verification/)