# Use Cases for Step Processing type " Logistical" & Metrology"

**URL:** <https://community.criticalmanufacturing.com/t/use-cases-for-step-processing-type-logistical-metrology/652>\
**Category:** Modelling & Configuration\
**Tags:** v11.3\
**Created:** [July 7, 2023, 10:43am UTC](https://community.criticalmanufacturing.com/t/use-cases-for-step-processing-type-logistical-metrology/652 "2023-07-07T10:43:42Z")\
**Posts on this page:** 5\
**Page:** 1

<div class="post-metadata">

**Author:** ![Joao\_Roque](https://yyz2.discourse-cdn.com/flex050/user_avatar/community.criticalmanufacturing.com/joao_roque/32/24_2.png) [@Joao\_Roque](https://community.criticalmanufacturing.com/u/Joao_Roque)\
**Post date:** [July 7, 2023, 10:43am UTC](https://community.criticalmanufacturing.com/t/use-cases-for-step-processing-type-logistical-metrology/652/1 "2023-07-07T10:43:42Z")

</div>

Hi All,

I am trying to figure out use cases for step processing type " Logistical" & Metrology" . in which scenarios we should choose these processing type.

Regards

-Sandeep

---

<div class="post-metadata">

**Author:** ![Joao\_Roque](https://yyz2.discourse-cdn.com/flex050/user_avatar/community.criticalmanufacturing.com/joao_roque/32/24_2.png) [@Joao\_Roque](https://community.criticalmanufacturing.com/u/Joao_Roque)\
**Post date:** [July 10, 2023, 6:30am UTC](https://community.criticalmanufacturing.com/t/use-cases-for-step-processing-type-logistical-metrology/652/2 "2023-07-10T06:30:29Z")

</div>

**Frank Hochschulz** wrote:

As far as I know the important part is, that those processing types do not set the “LastProcessResource” of a Material. So, if you have a process step and measurement steps afterwards, and something is off with the measurement, it’s probably not the measurement tool that is wrong, but the processing tool. So if there is a problem with the measurement you can easily set down the corresponding processing resource.

---

<div class="post-metadata">

**Author:** ![Joao\_Roque](https://yyz2.discourse-cdn.com/flex050/user_avatar/community.criticalmanufacturing.com/joao_roque/32/24_2.png) [@Joao\_Roque](https://community.criticalmanufacturing.com/u/Joao_Roque)\
**Post date:** [July 10, 2023, 12:08pm UTC](https://community.criticalmanufacturing.com/t/use-cases-for-step-processing-type-logistical-metrology/652/3 "2023-07-10T12:08:08Z")

</div>

**Sandeep Gautam** wrote:

thanks, Frank, for your response. I understood from your explanation is Measurement step is having processing type as “Metrology” and we are doing validation on this step. is this correct? But still i am not able to visualize when should i think any step with processing type as “Metrology”/Logistical while doing modeling.

---

<div class="post-metadata">

**Author:** ![Joao\_Roque](https://yyz2.discourse-cdn.com/flex050/user_avatar/community.criticalmanufacturing.com/joao_roque/32/24_2.png) [@Joao\_Roque](https://community.criticalmanufacturing.com/u/Joao_Roque)\
**Post date:** [October 15, 2025, 2:24pm UTC](https://community.criticalmanufacturing.com/t/use-cases-for-step-processing-type-logistical-metrology/652/4 "2025-10-15T14:24:29Z")

</div>

**José Romeu Gonçalves** wrote:

Hi.think about when you want to use the sampling plan: Either context “Material Process Resource” or context “Material Resource”. Same for SPC chart where in the context to create the logical chart you can have the LastProcessResouce or the Resource.Regard

---

<div class="post-metadata">

**Author:** ![Joao\_Roque](https://yyz2.discourse-cdn.com/flex050/user_avatar/community.criticalmanufacturing.com/joao_roque/32/24_2.png) [@Joao\_Roque](https://community.criticalmanufacturing.com/u/Joao_Roque)\
**Post date:** [September 11, 2026, 2:06pm UTC](https://community.criticalmanufacturing.com/t/use-cases-for-step-processing-type-logistical-metrology/652/5 "2026-09-11T14:06:08Z")

</div>

Closed on September 11, 2026, 2:06pm UTC

This topic was automatically closed 8 days after the last reply. New replies are no longer allowed.