Hi All,
I’m looking for your help in the following Use Case, where we aim at using Material Durables and Resource RunningModes together to tackle a scenario where MES needs to control the way of the resource is operating with the correct durables.
So, I have a resource operating in two different steps that can do 2 different processes. Each process has a specific running mode. However, there is a 3rd running mode that means that the resource can do both processes simultaneously (on different materials).
Each running mode ends up requiring a different set of durables.
Scenario details:
- Resource using Running Mode:
- Running Mode A - used when the equipment is performing a specific function only, like Load - StepName: LOADSTEP
- Running Mode B - Unload (for example) - StepName: UNLOADSTEP
- Running Mode C - Mixed - when the resource can simultaneously be loading and unloading containers (different materials)
- Step configurations:
-
-
StepName: LOADSTEP -
-
Can use Running Mode Load - if only doing Load
-
Can use Running Mode Exchange if also processing material in an Unload step
-
-
-
StepName: UNLOADSTEP:
-
Can use Running Mode Unload - if only doing Unload
-
Can use Running Mode Exchange, if also processing material in a Load step
-
-
- Important Notes:
- Each Running mode, because of the specific hardware used, requires a specific Durable BOM
- Load Step has a Durable Load BOM (if doing only Load)
- Unload Step has a Durable Unload BOM (if doing only Unload)
- How about the Exchange mode?
- EXCHANGE Running Mode requires part of the LoadBOM and part of the UnloadBOM
- Any ideas on how to model this scenario, and control which BOM is being used for a given product? Is Running Mode even advised here?
- Each Running mode, because of the specific hardware used, requires a specific Durable BOM
Let me know if you have any suggestion or ping me and we can talk about this!