Hi All,
I am trying to figure out use cases for step processing type " Logistical" & Metrology" . in which scenarios we should choose these processing type.
Regards
-Sandeep
Hi All,
I am trying to figure out use cases for step processing type " Logistical" & Metrology" . in which scenarios we should choose these processing type.
Regards
-Sandeep
Frank Hochschulz wrote:
As far as I know the important part is, that those processing types do not set the “LastProcessResource” of a Material. So, if you have a process step and measurement steps afterwards, and something is off with the measurement, it’s probably not the measurement tool that is wrong, but the processing tool. So if there is a problem with the measurement you can easily set down the corresponding processing resource.
Sandeep Gautam wrote:
thanks, Frank, for your response. I understood from your explanation is Measurement step is having processing type as “Metrology” and we are doing validation on this step. is this correct? But still i am not able to visualize when should i think any step with processing type as “Metrology”/Logistical while doing modeling.
José Romeu Gonçalves wrote:
Hi.think about when you want to use the sampling plan: Either context “Material Process Resource” or context “Material Resource”. Same for SPC chart where in the context to create the logical chart you can have the LastProcessResouce or the Resource.Regard